EV charging incentives in Con Edison and PSEG Long Island territory in 2026
Updated October 25, 2026
Summary
As of October 2026, the money available to New York EV owners comes from charging off-peak, not from exporting power from the car. Con Edison SmartCharge pays 10 cents per kWh for charging between midnight and 8 a.m., and PSEG Long Island offers a $100 rebate on qualifying Level 2 chargers plus Time-of-Day rates. Con Edison stopped accepting Level 2 make-ready applications in April 2026, and no residential vehicle-to-grid payment is available in either territory. Program terms change often, so confirm current terms with the utility before enrolling.
Con Edison SmartCharge New York
SmartCharge New York serves drivers who charge in Con Edison's territory in New York City and Westchester County. Con Edison's published incentives are as follows.
- 10 cents per kWh for charging between midnight and 8 a.m., every day of the year.
- A $25 bonus per vehicle or charger after three months of charging, which need not be consecutive.
- From June 1 to September 30, $35 for each month in which you avoid charging on weekdays from 2 to 6 p.m., plus a $35 bonus for avoiding it all summer.
- A $25 referral incentive for you and the person you refer.
- Con Edison reports that participants earn about $400 a year on average.
Drivers on a residential or small-business time-of-use rate (Service Classifications 1 and 2) are not eligible. You do not need to be a Con Edison customer, but the charging must take place in Con Edison's service area, and some Queens and Westchester ZIP codes fall outside it. Enrollment is through scny.ev.energy using the car's connected services or a compatible charger. The program does not control your charging; it rewards the timing you choose. Commercial fleets have a separate program, SmartCharge Commercial.
SmartCharge on the standard rate or whole-house time-of-use
Because SmartCharge excludes time-of-use customers, Con Edison households must choose. Whole-house time-of-use tends to pay more when other large, flexible loads also move to off-peak hours, such as a heat-pump water heater, laundry or a dishwasher. SmartCharge on the standard rate tends to pay more when the car is the only load that shifts. We do not publish rate figures here because they change; the comparison depends on your own usage.
We can model both options from twelve months of your Con Edison bills and interval data. A household that enrolls in SmartCharge while on a time-of-use rate earns nothing from it, so this check is worth doing before enrolling.
PSEG Long Island programs for EV owners
- Residential Charger Rebate: $100 toward a Level 2 charger on the EPRI Vetted Product List for PSEG Long Island. Customers in Disadvantaged Communities and on the Household Assistance Program can receive an additional $300, for $400 in total; confirm eligibility with PSEG Long Island.
- Time-of-Day Rate 194: the peak period is 3 to 7 p.m. on weekdays, and weekends and federal holidays are entirely off-peak.
- Super Off-Peak Rate 195: the 10 p.m. to 6 a.m. period is priced 40 percent below the flat rate. The other periods are 6 a.m. to 3 p.m., 3 to 7 p.m. (peak) and 7 to 10 p.m.
- Managed charging: since July 2025, ChargeScape has enrolled BMW and Ford drivers in PSEG Long Island's Peak Load Reduction program. Incentive amounts were not stated in the announcements; check the terms when your car prompts you to enroll.
For the rebate, the charger must be on the EPRI list at the time of purchase, and the application needs installation photos showing the model and serial number. We take these photos during installation and prepare the paperwork with the customer.
Home battery programs, and why EVs do not qualify
Con Edison's Bring Your Own Battery program pays $100 per kW of average seasonal performance. The season runs from May 1 to September 30, and events usually last up to four hours between 11 a.m. and 11 p.m. on weekdays. Eligible equipment includes the Tesla Powerwall+, Powerwall 2 and Powerwall 3 and certain SolarEdge inverter and battery combinations, and the program is administered by EnergyHub. NYSERDA announced on January 22, 2026 that enrollment will become a requirement for its residential storage incentive once Con Edison's program is live, with at least three weeks' notice. The other New York utilities pay $50 per kW-year.
An estimate shows the scale: a 13.5 kWh battery that delivers 80 percent of its capacity over a four-hour event averages 2.7 kW, which at $100 per kW comes to about $270 a year. PSEG Long Island's Battery Storage Rewards program runs from May 1 to September 30 with fewer than 10 events a season, each up to four hours and announced at least 21 hours ahead; the participating battery company sets the payment.
Electric vehicles are not listed as eligible in either program. Vehicle-to-grid exports do not qualify for these battery payments.
Make-ready funding for buildings and businesses in 2026
- On March 23, 2026, in Case 18-E-0138, the New York Public Service Commission directed the Joint Utilities to suspend new Level 2 and DC fast charging make-ready applications, effective 30 days later. DC fast charging may reopen once the items in the order are addressed.
- Con Edison PowerReady: as of April 22, 2026, Con Edison no longer accepts Level 2 project applications, and DC fast charging applications are paused until further notice. Projects on the waitlist keep their place but are not guaranteed eligibility under a future program.
- PSEG Long Island, which is not directly bound by the order, still accepts Level 2 projects, with up to $6,500 per port for customer-side work and up to $20,000 for utility-side work. DC fast charging offers up to $45,000 per port and $100,000 utility-side, but pre-approvals are on hold for the rest of 2026 under Program Announcement EVMR 2026-03 (April 21, 2026).
- PSEG Long Island also offers a 50 percent demand-charge rebate for public DC fast chargers on Rate 281 during 2026, and an EV Phase-In Rate for Rate 281 is expected in January 2027.
- NYSERDA Charge Ready NY 2.0 offers $3,000 per port at workplaces, multifamily buildings and hotels, plus $1,000 per port in Disadvantaged Communities, and $1,000 per port for spaces assigned to one driver or reserved for fleets. NYSERDA added $15 million in February 2026, bringing the budget to $28 million. Rebates are paid after installation; confirm current eligibility rules and remaining funds with NYSERDA.
A waitlist position is not a commitment of funds. We advise co-op and condominium boards not to budget a project on make-ready money until it is approved.
Which programs can be combined
| Programs | How they interact |
|---|---|
| Con Edison SmartCharge and a Con Edison residential time-of-use rate | Either one or the other. Time-of-use customers do not earn SmartCharge incentives. |
| Con Edison Bring Your Own Battery and the NYSERDA residential storage incentive | Required together once Con Edison's program is live. |
| PSEG Long Island make-ready and Charge Ready NY 2.0 | Reported as combinable; confirm with NYSERDA and PSEG Long Island for each project. |
| NYSERDA funding and the New York State charging-property tax credit | The state credit applies only to property used in a trade or business, and NYSERDA funding reduces it. |
The federal 30C charger credit ended for property placed in service after June 30, 2026. For the vehicle itself, NYSERDA's Drive Clean Rebate offers $500 to $2,000 at the point of sale, and New York added $30 million to it in April 2026. We are contractors, not tax advisors; for tax questions, consult a CPA such as Copper River Tax (copperrivertax.com).
Vehicle-to-grid payments in New York
We found no residential vehicle-to-grid export tariff in Con Edison or PSEG Long Island territory as of October 2026. New York's experience so far is limited to pilots: electric school buses in White Plains with Con Edison, and a fleet project in Red Hook, Brooklyn, in 2023 that was compensated through the state's Value of Distributed Energy Resources tariff. By comparison, Shenzhen paid 4 yuan per kWh during a city-wide V2G event in 2025, and Tesla runs an invitation-only Cybertruck program in Texas.
Our position is that in New York today, the money is in not charging at peak times, through SmartCharge or a time-of-use rate, and in stationary batteries enrolled in utility programs, not in exporting power from a car. We install residential and commercial chargers across NYC and Long Island, with electrical work performed by licensed partner electricians, file the PSEG Long Island rebate paperwork with the installation and can compare SmartCharge and time-of-use using your bills.
Frequently asked questions
Can I join SmartCharge if I am on a Con Edison time-of-use rate?
You can enroll, but you will not earn incentives. Drivers on residential or small-business time-of-use rates (Service Classifications 1 and 2) are not eligible for SmartCharge payments, so compare the two options before choosing.
Which chargers qualify for the PSEG Long Island rebate?
Level 2 chargers on the EPRI Vetted Product List for PSEG Long Island at the time of purchase. The application requires installation photos showing the model and serial number.
Can my EV earn money in Con Edison's Bring Your Own Battery program?
No. The program lists specific stationary batteries, such as the Tesla Powerwall and certain SolarEdge systems. Electric vehicles are not listed as eligible.
Is Con Edison PowerReady still open for building chargers?
Not for new Level 2 projects. Since April 22, 2026, Con Edison no longer accepts Level 2 applications, and DC fast charging applications are paused. Charge Ready NY 2.0 from NYSERDA remains an option while funds last.
Sources
- SmartCharge NY (for EV Drivers and Light-Duty Fleets) | Con Edison · Con Edison
- Enroll Your Battery and Earn | Con Edison · Con Edison
- PowerReady Light-Duty Vehicle Program | Con Edison · Con Edison
- Residential Charger Rebate Program - PSEG Long Island · PSEG Long Island
- Battery Storage Rewards Program - PSEG Long Island · PSEG Long Island
- Charge Ready NY 2.0 | NYSERDA · NYSERDA
General information only, not legal or engineering advice. Rules change and every building is different. Confirm requirements with the Department of Buildings, your local building department or your building management.