[{"data":1,"prerenderedAt":84},["ShallowReactive",2],{"guide-solar-for-homes-zh-Hant":3},{"guide":4,"related":64},{"title":5,"seoTitle":6,"description":7,"summary":8,"sections":9,"faq":31,"date":38,"service":39,"order":40,"sources":41,"slug":62,"locale":63},"紐約市及長島住宅太陽能安裝前的評估要點","住宅太陽能板｜紐約・長島","屋頂狀況、遮蔭、消防退縮距離、許可證、電網併網及優惠：影響物業是否適合安裝太陽能板的因素。","太陽能板最適合狀況良好、沒有遮蔭、多年內毋須更換的屋頂。完善的方案按您的屋頂及電費單計算，包括許可證及電網併網，並列明計算假設。",[10,14,22,27],{"heading":11,"paragraphs":12},"屋頂狀況",[13],"太陽能板一般可使用 25 年或以上。屋頂接近使用年限的，先更換屋頂，通常比日後拆板重裝便宜。",{"heading":15,"list":16},"決定系統容量的因素",[17,18,19,20,21],"扣除消防退縮距離及通道後的可用屋頂面積","樹木及鄰近樓宇的遮蔭","屋頂朝向及斜度","用電量，以 12 個月電費單計算","電箱能否接駁",{"heading":23,"paragraphs":24},"許可證及電力公司",[25,26],"太陽能系統須申請建築及電力許可證，並經電力公司批准併網後方可啟用。紐約市消防規範要求屋頂預留通道，會影響太陽能板的排列。","由簽約到啟用，一般需時數星期至數個月，大部分時間花在審批。",{"heading":28,"paragraphs":29},"優惠",[30],"聯邦住宅太陽能稅務抵免，已不適用於 2025 年 12 月 31 日之後完成安裝的系統；即使於 2025 年付款，若安裝於 2026 年才完成，亦不符合資格。紐約州仍有太陽能稅務抵免及 NY-Sun 優惠，紐約市亦有太陽能地產稅減免。相關規定可能變動，請要求方案逐項列出所計算的優惠，稅務問題請向您的稅務顧問確認。",[32,35],{"q":33,"a":34},"市區平頂可否安裝太陽能板？","多數情況下可以。平頂採用傾斜支架，排板時須預留消防通道。",{"q":36,"a":37},"EPC 是指什麼？","即設計、採購及施工（Engineering, Procurement and Construction）：由同一承包商負責設計、採購設備及安裝系統。","2026-10-24","solar",6,[42,46,50,54,58],{"title":43,"url":44,"publisher":45},"FAQs on energy credit changes under Public Law 119-21","https:\u002F\u002Fwww.irs.gov\u002FEnergyCreditFAQs","Internal Revenue Service",{"title":47,"url":48,"publisher":49},"Solar Energy System Equipment Credit","https:\u002F\u002Fwww.tax.ny.gov\u002Fpit\u002Fcredits\u002Fsolar_energy_system_equipment_credit.htm","New York State Department of Taxation and Finance",{"title":51,"url":52,"publisher":53},"NY-Sun: Solar for Homes","https:\u002F\u002Fwww.nyserda.ny.gov\u002FAll-Programs\u002FNY-Sun\u002FOn-site-Solar\u002FHomes","NYSERDA",{"title":55,"url":56,"publisher":57},"Solar Electric Generating System (SEGS) Tax Abatement","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Ffinance\u002Fproperty\u002Flandlords-solar-roof.page","NYC Department of Finance",{"title":59,"url":60,"publisher":61},"Project Requirements: Design Professional - Solar","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Findustry\u002Fproject-requirements-design-professional-solar.page","NYC Department of Buildings","solar-for-homes","zh-Hant",[65,70,74,80],{"slug":66,"title":67,"description":68,"service":69,"date":38},"nyc-renovation-permits","紐約裝修及電力工程許可證須知","哪些裝修、電力及水喉工程需要紐約市建築局（DOB）許可證、由誰申請，以及長島的不同之處。","electrical",{"slug":71,"title":72,"description":73,"service":69,"date":38},"electrical-panel-upgrade","更換電箱及供電升級的徵兆、步驟及所需時間","紐約市及長島舊屋何時需要更換電箱或升級供電、工程內容及所需時間。先進行負荷計算，可避免不必要的開支。",{"slug":75,"title":76,"description":77,"service":78,"date":79},"ev-charging-without-service-upgrade","毋須升級供電的電動車充電方案","負載分配、CT 夾動態負載管理、乾衣機插座共用裝置及合適電流的充電器：紐約市及長島毋須升級供電即可安裝充電器的方案。","ev-charging","2026-10-25",{"slug":81,"title":82,"description":83,"service":78,"date":38},"ev-charger-installation","紐約市及長島家用電動車充電器安裝","Level 1 與 Level 2 的分別、電箱容量、許可證、Tesla Powershare，以及紐約市及長島住宅和樓宇安裝須知。",1792924281385]