[{"data":1,"prerenderedAt":80},["ShallowReactive",2],{"guide-kitchen-bathroom-planning-zh-Hant":3},{"guide":4,"related":60},{"title":5,"seoTitle":6,"description":7,"summary":8,"sections":9,"faq":33,"date":40,"service":41,"order":42,"sources":43,"slug":58,"locale":59},"紐約廚房及浴室裝修規劃","廚房浴室裝修規劃","索取報價前須確定的事項：工程範圍、格局、電力容量、通風、防水、物料到貨時間及預留預算。","應盡早決定是否改動格局。移動水喉、煤氣或牆身，須額外申請許可證及審批，費用亦相應增加。櫥櫃及潔具宜提早訂購，並預留一筆款項，應付拆開牆身後發現的問題。",[10,14,22,29],{"heading":11,"paragraphs":12},"保留格局還是重新規劃",[13],"水槽、馬桶及爐具保留原位，是最節省的做法。如需移位，則須重新接駁水管，一般須申請許可證，Co-op 及 Condo 還可能須經 board 審批。",{"heading":15,"list":16},"廚房清單",[17,18,19,20,21],"電力容量足以讓電磁爐、洗碗機及微波爐各用獨立電路","如大廈允許，抽油煙機應排氣至室外，否則採用循環式","櫥櫃到貨時間一般需數星期，訂造更久","檯面須待櫥櫃裝好後才測量尺寸並製作","檯面插座數量須符合電力規範",{"heading":23,"list":24},"浴室清單",[25,26,27,28],"瓷磚底層須妥善防水，淋浴間及樓下有住戶的浴室尤其重要","抽氣扇須正確排氣至室外","鋪磚前選定淋浴龍頭閥及去水","拆除前確保瓷磚及潔具已送抵工地，以免工期中斷",{"heading":30,"paragraphs":31},"預算及工期",[32],"預留 10% 至 15% 預算應付意外，例如地台底板腐爛或舊電線。不改格局的浴室，施工一般需數星期；廚房及需要審批的工程更長。",[34,37],{"q":35,"a":36},"裝修期間可否繼續居住？","只裝修一個房間的，採取防塵措施後一般可繼續居住。如廚房或唯一的浴室需停用，則須預備數星期的替代安排。",{"q":38,"a":39},"可否自行購買潔具？","可以。請在報價前告知我們，報價將只計算安裝費用；並請提早訂貨，以免因等候貨品延誤工期。","2026-10-24","kitchen",9,[44,48,51,54],{"title":45,"url":46,"publisher":47},"Plumbing Permits","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fplumbing-permits.page","NYC Department of Buildings",{"title":49,"url":50,"publisher":47},"Do I Need a Permit?","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fdo-i-need-a-permit.page",{"title":52,"url":53,"publisher":47},"Home Improvement Contractor Permit Requirements","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fhome-improvement-contractor-permit-requirements.page",{"title":55,"url":56,"publisher":57},"A Brief Guide to Mold, Moisture and Your Home","https:\u002F\u002Fwww.epa.gov\u002Fmold\u002Fbrief-guide-mold-moisture-and-your-home","U.S. Environmental Protection Agency","kitchen-bathroom-planning","zh-Hant",[61,66,70,76],{"slug":62,"title":63,"description":64,"service":65,"date":40},"nyc-renovation-permits","紐約裝修及電力工程許可證須知","哪些裝修、電力及水喉工程需要紐約市建築局（DOB）許可證、由誰申請，以及長島的不同之處。","electrical",{"slug":67,"title":68,"description":69,"service":65,"date":40},"electrical-panel-upgrade","更換電箱及供電升級的徵兆、步驟及所需時間","紐約市及長島舊屋何時需要更換電箱或升級供電、工程內容及所需時間。先進行負荷計算，可避免不必要的開支。",{"slug":71,"title":72,"description":73,"service":74,"date":75},"ev-charging-without-service-upgrade","毋須升級供電的電動車充電方案","負載分配、CT 夾動態負載管理、乾衣機插座共用裝置及合適電流的充電器：紐約市及長島毋須升級供電即可安裝充電器的方案。","ev-charging","2026-10-25",{"slug":77,"title":78,"description":79,"service":74,"date":40},"ev-charger-installation","紐約市及長島家用電動車充電器安裝","Level 1 與 Level 2 的分別、電箱容量、許可證、Tesla Powershare，以及紐約市及長島住宅和樓宇安裝須知。",1792924281685]