[{"data":1,"prerenderedAt":72},["ShallowReactive",2],{"guide-tesla-powershare-home-backup-zh-Hans":3},{"guide":4,"related":53},{"title":5,"seoTitle":6,"description":7,"summary":8,"sections":9,"faq":29,"date":36,"service":37,"order":38,"sources":39,"slug":51,"locale":52},"Tesla Powershare：以电动车作为家庭备用电源","Tesla Powershare 家庭备用电源安装","Tesla Powershare 车辆向家庭供电（V2H）所需的设备、与普通充电桩的区别，以及在纽约市和长岛需要办理的开工许可。","Powershare 可使兼容的 Tesla 车辆在停电时为家中供电。系统需要 Tesla 备用电源设备将房屋与电网安全隔离，并配备相应的 Tesla Wall Connector 充电桩（所需设备因车型而异），由持证电工安装、申报开工许可并通知电力公司。",[10,15,23],{"heading":11,"paragraphs":12},"工作原理",[13,14],"电网停电时，备用电源设备将房屋与电网断开，由车辆为家中线路供电；电网恢复供电后再切换回来。这一隔离措施可保障电力公司抢修人员的安全。","所需设备因车型而异。Cybertruck 可使用 Powershare Gateway 搭配 Universal Wall Connector，无需 Powerwall。Model 3 和 Model Y 须配备 Powerwall，以及 Universal Wall Connector 或 Wall Connector 3，且仅保证支持 2026 年 10 月 1 日或之后订购的美国车辆。目前哪些车型支持家用 Powershare，请以 Tesla 官方信息为准。",{"heading":16,"list":17},"安装内容",[18,19,20,21,22],"负荷计算，并确定停电时需要保障的线路","在电力进户处安装 Tesla 备用电源设备：Cybertruck 使用 Powershare Gateway，Model 3 和 Model Y 使用 Powerwall 系统","Universal Wall Connector 配置专用线路（Model 3 和 Model Y 亦可使用 Wall Connector 3）","电路工程开工许可、检查及电力公司手续","在 Tesla App 中完成设置，并测试切换功能（provisioning）",{"heading":24,"list":25},"决定前须考虑的事项",[26,27,28],"电箱及供电容量可能需要先行升级","确定停电时必须运行的设备：供暖控制、冰箱、地下室排水泵及照明","Co-op、Condo 及多户住宅楼改动供电系统，须经大楼批准",[30,33],{"q":31,"a":32},"Powershare 与普通充电桩是否相同？","不同。普通充电桩仅为车辆充电；Powershare 还需将车辆电力输送回家中，因此需要额外设备及规范的切换装置。",{"q":34,"a":35},"是否需要开工许可？","需要。这属于在电力进户处新增的电路工程，须申报开工许可并通过检查。","2026-10-24","ev-charging",5,[40,44,47],{"title":41,"url":42,"publisher":43},"Tesla Powershare","https:\u002F\u002Fwww.tesla.com\u002Fsupport\u002Fpowershare","Tesla",{"title":45,"url":46,"publisher":43},"What Can Powershare Back Up","https:\u002F\u002Fwww.tesla.com\u002Fsupport\u002Fpowershare\u002Fwhat-can-powershare-back-up",{"title":48,"url":49,"publisher":50},"Electrical Permit","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Felectrical-permit.page","NYC Department of Buildings","tesla-powershare-home-backup","zh-Hans",[54,59,63,68],{"slug":55,"title":56,"description":57,"service":58,"date":36},"nyc-renovation-permits","纽约装修及电路工程的开工许可（开工纸）规定","纽约哪些装修、电路及水路工程需要向建筑局（DOB）申报开工许可（开工纸），由谁申报，以及长岛的规定有何不同。","electrical",{"slug":60,"title":61,"description":62,"service":58,"date":36},"electrical-panel-upgrade","更换电箱与电力升级的判断时机、施工步骤及工期","纽约市和长岛的老旧房屋何时需要更换电箱或进行电力升级，施工包括哪些内容，以及所需时间。",{"slug":64,"title":65,"description":66,"service":37,"date":67},"ev-charging-without-service-upgrade","无需电力升级的充电桩安装方案","动态负载分配（CT 夹）、烘干机插座共用设备及合理设定充电电流，是在纽约市和长岛无需电力升级即可加装充电桩的几种方式。","2026-10-25",{"slug":69,"title":70,"description":71,"service":37,"date":36},"ev-charger-installation","纽约市及长岛家用电动车充电桩安装须知","Level 1 与 Level 2 的区别、电箱容量、开工许可、Tesla Powershare，以及在纽约市和长岛的独立屋及楼宇安装充电桩的注意事项。",1792924274735]