[{"data":1,"prerenderedAt":77},["ShallowReactive",2],{"guide-coop-condo-renovation-zh-Hans":3},{"guide":4,"related":57},{"title":5,"seoTitle":6,"description":7,"summary":8,"sections":9,"faq":34,"date":41,"service":42,"order":43,"sources":44,"slug":55,"locale":56},"Co-op 和 Condo 装修的改建协议与 board 审批","纽约 Co-op·Condo 装修审批","纽约 Co-op 和 Condo 的 board 在装修前通常要求的文件和规定：改建协议、图纸、保险、施工时间、押金，以及湿区不得位于干区上方的规定。","大部分 Co-op 和许多 Condo 在开工前，要求提交已签署的改建协议（alteration agreement）、图纸、承包商保险证明及押金。审批通常需要数周，建议尽早递交。",[10,18,23,30],{"heading":11,"list":12},"board 通常要求的文件",[13,14,15,16,17],"由您签署的改建协议","施工范围；较大工程还需建筑师图纸","承包商执照，以及将大楼和管理公司列为附加被保险人的保险证明","施工计划及预计工期","可退还的押金及审核费",{"heading":19,"paragraphs":20},"影响设计的大楼规定",[21,22],"许多大楼不允许将厨房、浴室等湿区移至楼下住户干区（卧室、客厅）的上方。这项 wet-over-dry 规定，往往决定新浴室或厨房的位置。","部分大楼还对厨房排风、洗衣烘干机、煤气工程及立管改动设有限制。设计前请先向管理公司索取大楼规定，以免图纸返工。",{"heading":24,"list":25},"施工期间",[26,27,28,29],"施工时间由大楼规定，通常为工作日的办公时间","电梯及走廊须做好保护，送货须预约电梯","每日清理公共区域","部分工程须经大楼的建筑师或工程师检查",{"heading":31,"paragraphs":32},"时间安排",[33],"board 审核通常需要数周；如大楼工程师提出疑问，时间将更长。需要 DOB 开工许可的工程可同步申报。制定工程计划时，请预留这段审批时间。",[35,38],{"q":36,"a":37},"Condo 的管理是否比 Co-op 更严格？","通常较为宽松，但 Condo 同样设有改建规定和保险要求。请查阅大楼章程（bylaws）或咨询管理公司。",{"q":39,"a":40},"申请文件由谁准备？","改建协议由您签署；承包商提供保险证明、执照及施工计划；需要图纸时由建筑师出图。我们负责准备承包商部分的文件，并协助您整理完整的申请材料。","2026-10-24","kitchen",8,[45,49,52],{"title":46,"url":47,"publisher":48},"Home Improvement Contractor Permit Requirements","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fhome-improvement-contractor-permit-requirements.page","NYC Department of Buildings",{"title":50,"url":51,"publisher":48},"After Hour Variances","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fafter-hour-variances-info.page",{"title":53,"url":54,"publisher":48},"Know Your Construction Professional","https:\u002F\u002Fwww.nyc.gov\u002Fsite\u002Fbuildings\u002Fproperty-or-business-owner\u002Fknow-your-construction-professional.page","coop-condo-renovation","zh-Hans",[58,63,67,73],{"slug":59,"title":60,"description":61,"service":62,"date":41},"nyc-renovation-permits","纽约装修及电路工程的开工许可（开工纸）规定","纽约哪些装修、电路及水路工程需要向建筑局（DOB）申报开工许可（开工纸），由谁申报，以及长岛的规定有何不同。","electrical",{"slug":64,"title":65,"description":66,"service":62,"date":41},"electrical-panel-upgrade","更换电箱与电力升级的判断时机、施工步骤及工期","纽约市和长岛的老旧房屋何时需要更换电箱或进行电力升级，施工包括哪些内容，以及所需时间。",{"slug":68,"title":69,"description":70,"service":71,"date":72},"ev-charging-without-service-upgrade","无需电力升级的充电桩安装方案","动态负载分配（CT 夹）、烘干机插座共用设备及合理设定充电电流，是在纽约市和长岛无需电力升级即可加装充电桩的几种方式。","ev-charging","2026-10-25",{"slug":74,"title":75,"description":76,"service":71,"date":41},"ev-charger-installation","纽约市及长岛家用电动车充电桩安装须知","Level 1 与 Level 2 的区别、电箱容量、开工许可、Tesla Powershare，以及在纽约市和长岛的独立屋及楼宇安装充电桩的注意事项。",1792924275588]