[{"data":1,"prerenderedAt":208},["ShallowReactive",2],{"guides-zh-Hans":3},[4,10,14,20,24,28,33,38,43,47,51,56,61,66,71,76,80,85,89,94,98,102,106,110,114,118,122,126,130,134,138,143,147,151,155,160,164,168,172,176,180,184,188,192,196,200,204],{"slug":5,"title":6,"description":7,"service":8,"date":9},"nyc-renovation-permits","纽约装修及电路工程的开工许可（开工纸）规定","纽约哪些装修、电路及水路工程需要向建筑局（DOB）申报开工许可（开工纸），由谁申报，以及长岛的规定有何不同。","electrical","2026-10-24",{"slug":11,"title":12,"description":13,"service":8,"date":9},"electrical-panel-upgrade","更换电箱与电力升级的判断时机、施工步骤及工期","纽约市和长岛的老旧房屋何时需要更换电箱或进行电力升级，施工包括哪些内容，以及所需时间。",{"slug":15,"title":16,"description":17,"service":18,"date":19},"ev-charging-without-service-upgrade","无需电力升级的充电桩安装方案","动态负载分配（CT 夹）、烘干机插座共用设备及合理设定充电电流，是在纽约市和长岛无需电力升级即可加装充电桩的几种方式。","ev-charging","2026-10-25",{"slug":21,"title":22,"description":23,"service":18,"date":9},"ev-charger-installation","纽约市及长岛家用电动车充电桩安装须知","Level 1 与 Level 2 的区别、电箱容量、开工许可、Tesla Powershare，以及在纽约市和长岛的独立屋及楼宇安装充电桩的注意事项。",{"slug":25,"title":26,"description":27,"service":18,"date":9},"tesla-powershare-home-backup","Tesla Powershare：以电动车作为家庭备用电源","Tesla Powershare 车辆向家庭供电（V2H）所需的设备、与普通充电桩的区别，以及在纽约市和长岛需要办理的开工许可。",{"slug":29,"title":30,"description":31,"service":32,"date":9},"solar-for-homes","纽约市及长岛住宅安装太阳能前的评估要点","屋顶状况、遮挡、消防退让、开工许可、电力公司并网及补贴：决定您的房屋是否适合安装太阳能的关键因素。","solar",{"slug":34,"title":35,"description":36,"service":37,"date":19},"contractor-vs-diy","聘请承包商与自行施工的成本比较","在纽约市和长岛，哪些情况下聘请持照承包商比自行施工更经济：建材批发价、避免返工、估价包含开工许可。","renovation",{"slug":39,"title":40,"description":41,"service":42,"date":9},"coop-condo-renovation","Co-op 和 Condo 装修的改建协议与 board 审批","纽约 Co-op 和 Condo 的 board 在装修前通常要求的文件和规定：改建协议、图纸、保险、施工时间、押金，以及湿区不得位于干区上方的规定。","kitchen",{"slug":44,"title":45,"description":46,"service":42,"date":9},"kitchen-bathroom-planning","纽约厨房及浴室装修规划要点","向承包商索取估价前需要确定的事项：施工范围、格局、电力容量、排风、防水、订货周期及预备金。",{"slug":48,"title":49,"description":50,"service":37,"date":9},"compare-contractor-estimates","如何比较装修承包商的估价","比较纽约装修及电路工程估价的实用清单：施工范围、暂定金额、不包含项目、开工许可、付款安排、执照及保险。",{"slug":52,"title":53,"description":54,"service":55,"date":19},"rental-turnover-cost-tips","降低出租单位翻新及维修成本的实用做法","纽约市和长岛房东缩短空置期、降低每次翻新费用的实用做法：统一标准材料、选用耐用饰面、实施计划性保养。","rental",{"slug":57,"title":58,"description":59,"service":60,"date":19},"flood-fire-damage-first-steps","水灾、火灾后纽约市及长岛业主的应对步骤","发生漏水、水浸或火灾后最初几天的应对要点：人身安全、断电、保险理赔记录、除湿，以及拆除与重建的决策。","restoration",{"slug":62,"title":63,"description":64,"service":65,"date":9},"building-maintenance-checklist","纽约小型楼宇业主维修保养清单","纽约市小型多户住宅楼及商住楼的季度和年度保养要点，以及多数楼宇须完成的法定检查。","maintenance",{"slug":67,"title":68,"description":69,"service":70,"date":19},"nyc-local-law-92-94-roof-replacement","纽约市换屋顶与 92 号、94 号地方法（Local Laws 92\u002F94）的太阳能及绿色屋顶要求","纽约市更换屋顶何时须加装太阳能板或绿色屋顶、哪些面积可以扣除，以及如何规划 DOB 申报。","roofing",{"slug":72,"title":73,"description":74,"service":75,"date":19},"nyc-local-law-152-gas-piping-inspection","纽约市 152 号地方法（Local Law 152）煤气管道检查指南，含 2026 年 12 月 31 日截止的社区","哪些楼宇须做 Local Law 152 煤气管道检查、哪些社区 2026 年 12 月 31 日截止、检查内容及申报与整改期限。","plumbing",{"slug":77,"title":78,"description":79,"service":55,"date":19},"nyc-lead-paint-apartment-turnover","纽约市房东换租客时的含铅油漆规定","纽约 1960 年前出租房换租客时，房东依 Local Law 1 须完成的含铅油漆工程、XRF 检测、铅尘清洁标准及记录保存要求。",{"slug":81,"title":82,"description":83,"service":84,"date":19},"nyc-ny-gas-ban-new-buildings","纽约市 Local Law 154 与纽约州《全电气建筑法》对新建筑及整体翻新的规定","纽约市 Local Law 154 与纽约州全电气建筑法对新建房屋和整体翻新的影响，含生效日期及截至 2026 年 10 月的法院进展。","construction",{"slug":86,"title":87,"description":88,"service":32,"date":19},"long-island-solar-permits-by-town","长岛各镇及各村的太阳能许可证申请要求","长岛各镇、各村的太阳能许可证要求不同。申请条件、图纸盖章、费用、CO 核查及 PSEG Long Island 并网流程（2026 年 10 月）。",{"slug":90,"title":91,"description":92,"service":93,"date":19},"local-law-97-coop-condo-capital-plan","纽约中型合作公寓（Co-op）与共管公寓（Condo）的 Local Law 97 资本工程规划","25,000 至 60,000 平方英尺的纽约合作公寓和共管公寓，如何围绕 2030 年 LL97 碳排放限额规划屋顶、锅炉及外墙工程。","project-management",{"slug":95,"title":96,"description":97,"service":18,"date":19},"ev-buyer-home-electrical-checklist","买电动车前的家用充电电路检查清单","按车载充电机功率选择充电桩，合理确定电路规格，并确认反向供电（V2H）支持情况。纽约市及长岛买电动车前的家用电路检查要点。",{"slug":99,"title":100,"description":101,"service":18,"date":19},"ev-home-backup-v2h-new-york","以电动车作为纽约住宅的停电备用电源（V2H）","V2L、V2H 与 V2G 的区别，各品牌所需设备，电动车可为纽约市及长岛住宅供电多久，以及与家用储能电池的比较。",{"slug":103,"title":104,"description":105,"service":8,"date":19},"ny-electrical-service-size-100a-200a","纽约住宅加装电动车充电桩、热泵和电磁炉时如何确定供电容量","纽约市及长岛如何按 NEC 220.83 和 220.87 进行负荷计算，100 安何时够用、何时需要 200 安，以及智能电箱的适用情况。",{"slug":107,"title":108,"description":109,"service":18,"date":19},"why-automakers-restrict-v2h","车企为何限制双向充电，以及对保修和电池寿命的实际影响","车企并不反对车辆向家庭供电（V2H），而是控制其使用方式。本文结合认证设备、放电下限及电池衰减研究，为纽约及长岛车主提供分析。",{"slug":111,"title":112,"description":113,"service":18,"date":19},"ev-charging-standards-gbt-ccs-nacs","国标 GB\u002FT 与 CCS、NACS、CHAdeMO、ChaoJi 充电标准的开放性、安全性及可靠性对比","国标 GB\u002FT 与 CCS、NACS（SAE J3400）、CHAdeMO、ChaoJi 的区别，并核实特斯拉在中国采用国标充电口及外放电的说法。",{"slug":115,"title":116,"description":117,"service":8,"date":19},"bidirectional-charging-ready-renovation","装修时为双向充电预留线路，避免被单一品牌绑定","2026 年双向充电桩仍按品牌绑定。纽约及长岛装修时，如何规划预埋管、电箱位置、备用电路分电箱及相关认证。",{"slug":119,"title":120,"description":121,"service":18,"date":19},"nyc-long-island-ev-charging-incentives-2026","2026 年 Con Edison 与 PSEG Long Island 服务区电动车充电补贴及奖励","截至 2026 年 10 月的 Con Ed SmartCharge、长岛 PSEG 充电桩补贴与分时电价、储能项目、Make-Ready 暂停及 V2G 现状。",{"slug":123,"title":124,"description":125,"service":18,"date":19},"direct-sourced-dc-fast-chargers-vs-network","纽约业主自购直流快充桩与选择充电网络整包方案的成本与风险对比","纽约商铺、停车场业主自购 UL 2202 认证直流快充桩可节省哪些费用、需承担哪些责任，以及 2026 年关税与 Buy America 规定。",{"slug":127,"title":128,"description":129,"service":18,"date":19},"ev-charger-demand-charges-con-edison-pseg-li","Con Edison 与 PSEG 长岛地区充电桩需量电费及 2026 年电价优惠与补贴","纽约商用充电桩为何电费高于收入，以及截至 2026 年 10 月 Con Ed 和 PSEG 长岛仍可申请的电价优惠与补贴。",{"slug":131,"title":132,"description":133,"service":18,"date":19},"commercial-ev-charging-level-2-vs-dc-fast","商铺充电桩按顾客停留时间选择 Level 2 交流或直流快充","纽约及长岛餐馆、商铺、购物广场、公寓楼和车队场站如何按停留时间选择充电功率，以及收费方式、超时占位费和无障碍布局。",{"slug":135,"title":136,"description":137,"service":18,"date":19},"ocpp-vs-ocpi-ev-charging-network-lock-in","业主须了解的 OCPP、OCPI 与 ISO 15118，以及如何避免被充电网络绑定","OCPP 连接充电桩与后台，OCPI 连接不同充电网络，ISO 15118 连接车辆。纽约业主如何保留更换充电平台的主动权。",{"slug":139,"title":140,"description":141,"service":142,"date":19},"whole-home-audio-vs-smart-speakers","全屋音响与智能音箱的选择，以及装修时音响线的预埋要点","比较吸顶音响、流媒体功放与智能音箱，说明纽约装修开墙期间音响线的线径、防火等级及走线规划。","low-voltage",{"slug":144,"title":145,"description":146,"service":142,"date":19},"wifi-network-planning-nyc","纽约住宅及小型办公室的 Wi-Fi 与网络布线规划","纽约褐石楼、公寓及小型办公室的全屋 Wi-Fi 覆盖规划，涵盖吸顶无线 AP、Cat6 与 Cat6A 选择、PoE 供电及弱电箱位置。",{"slug":148,"title":149,"description":150,"service":142,"date":19},"low-voltage-system-design-nyc","纽约建筑弱电系统设计与 2025 年《纽约市电气规范》要求","网络、监控、可视对讲、门禁及音响统一弱电布线方案，以及 2025 年纽约市电气规范关于开工许可和持证施工的规定。",{"slug":152,"title":153,"description":154,"service":142,"date":19},"internet-service-entrance-planning","网络进户线规划、光猫设备位置及防止线路被剪断的措施","Fios、Optimum 及 Spectrum 网络进户位置规划，光猫及设备摆放，停电备用电源，以及进户线被剪断时保持监控和报警正常工作的方法。",{"slug":156,"title":157,"description":158,"service":159,"date":19},"whole-home-humidifier-nyc-winter","纽约冬季全屋加湿器与室内适宜湿度设定","纽约冬天室内为何太干、按室外温度设定室内湿度的参考表，以及湿度过高导致窗户结露、墙角发霉和保温层受损的原因。","hvac",{"slug":161,"title":162,"description":163,"service":159,"date":19},"erv-hrv-makeup-air-nyc","纽约住宅新风系统选择、抽油烟机补风、浴室排风与空气过滤","气密住宅需要多少新风、纽约适合 ERV 还是 HRV、纽约市与纽约州对抽油烟机补风的规定、浴室排风扇、燃烧安全及 MERV 13 过滤。",{"slug":165,"title":166,"description":167,"service":159,"date":19},"basement-dehumidifier-long-island-queens","长岛及皇后区地下室潮湿问题与正确的除湿方法","长岛和皇后区地下室为何夏天潮湿发霉、地下室湿度多少合适、2019 年标准变更后除湿机如何选型，以及排水安装要点。",{"slug":169,"title":170,"description":171,"service":55,"date":19},"rental-repair-vs-improvement-tax","出租房翻新：维修与资本化改良的区分及会计师所需的资料","纽约市及长岛房东出租房翻新前须知：IRS 维修与改良的判定标准、可与会计师讨论的安全港规则，以及发票应如何分项列明。",{"slug":173,"title":174,"description":175,"service":32,"date":19},"ny-solar-heat-pump-ev-tax-credits-2026","2026 年纽约太阳能、储能电池、热泵及充电桩税务优惠：联邦政策调整后的现状","2025 年联邦法律调整后，哪些住宅节能税收抵免已终止，纽约州及纽约市的太阳能与储能税务优惠截至 2026 年 10 月仍然有效。",{"slug":177,"title":178,"description":179,"service":60,"date":19},"flood-fire-damage-tax-records","房屋水灾或火灾后应保存的税务记录，以及 2026 年州级灾害的新规定","纽约市及长岛业主遭遇水灾或火灾后应保存的记录、2026 年州宣布灾害的新规定，以及出租房产的不同处理方式。",{"slug":181,"title":182,"description":183,"service":70,"date":19},"solar-shingles-vs-panels-new-roof","纽约及长岛换屋顶时，太阳能瓦与支架式太阳能板的选择","纽约市及长岛更换屋顶时，太阳能瓦、支架式太阳能板与金属屋顶方案在发电量、规范、维修及保修方面的对比，并介绍欧洲与中国的做法。",{"slug":185,"title":186,"description":187,"service":32,"date":19},"solar-fire-setbacks-rapid-shutdown-nyc","纽约市与纽约州其他地区的太阳能消防退距及快速关断要求","FDNY 消防通道、纽约市以外的屋脊退距、2025 年新规范下的快速关断，以及微型逆变器与组串式逆变器的对比。",{"slug":189,"title":190,"description":191,"service":32,"date":19},"add-battery-to-existing-solar-nyc","纽约市及长岛现有太阳能系统加装储能电池","现有太阳能加装电池：同品牌电池、Powerwall 3 或交流耦合混合逆变器，以及 2025 年 10 月 26 日起纽约市家用电池的安装位置规定。",{"slug":193,"title":194,"description":195,"service":32,"date":19},"solar-carport-pergola-canopy","纽约双玻太阳能车棚、凉亭及雨棚","纽约市及长岛太阳能车棚、凉亭和双玻雨棚：组件认证为何不等于结构认可，以及所需的工程图纸和开工许可。",{"slug":197,"title":198,"description":199,"service":142,"date":19},"home-assistant-local-smart-home","纽约住宅与楼宇的 Home Assistant 本地智能家居控制","不依赖云的智能家居如何实现：Home Assistant 本地控制灯光、暖气与门锁，厂商停服或断网仍可使用，并说明纽约租户数据隐私法。",{"slug":201,"title":202,"description":203,"service":142,"date":19},"local-control-smart-devices","不依赖云端的智能家居设备选购指南（按类别）","哪些灯光、温控器、门锁、摄像头、太阳能、储能电池和充电桩可在 Home Assistant 中本地运行：附 2026 年 10 月本地与云端对照表。",{"slug":205,"title":206,"description":207,"service":142,"date":19},"smart-home-prewire-renovation","装修时如何为本地控制智能家居做好预埋布线","装修开墙时应预留的智能家居线路：开关盒零线、加深开关盒、温控器线、门禁及传感器线路，以及控制器位置。适用于纽约住宅。",1792924269185]